A standard ASTM D3385-18 field deployment follows a methodical operational workflow: Step 1: Site Preparation
A single-ring infiltrometer often overestimates infiltration rates because water diverges laterally (sideways) once it passes the bottom edge of the ring. The double-ring design solves this issue:
Why are two rings necessary instead of one? The answer lies in soil physics. astm d338518 pdf
Driving the rings into the ground requires specific tools to prevent soil disturbance. A heavy sledgehammer, a specialized driving cap, and a wood block are typically used. Alternatively, a hydraulic jack system mounted to a heavy vehicle can be utilized, which applies continuous, steady downward force rather than sudden impacts. 3. Constant-Level Liquid Maintenance
Executing an ASTM D3385-18 test requires careful site preparation and precise execution. Step 1: Site Selection and Preparation Select a representative, undisturbed area of soil. A standard ASTM D3385-18 field deployment follows a
Users searching for this standard often use variations including:
Infiltration Rate of Soils in Field Using Double-Ring Infiltrometer1 Driving the rings into the ground requires specific
Tamp the soil lightly along the inside and outside edges of the ring walls to prevent water from bypassing along the metal edges (piping channels).